Title 30

CHAPTER II SUBCHAP B

Subchapter B - Offshore

30:2.0.1.2.3PART 250
PART 250 - OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF
30:2.0.1.2.3.1SUBPART A
Subpart A - General
30:2.0.1.2.3.1.66SUBJGRP 66
  Authority and Definition of Terms
30:2.0.1.2.3.1.66.1SECTION 250.101
     250.101 Authority and applicability.
30:2.0.1.2.3.1.66.2SECTION 250.102
     250.102 What does this part do
30:2.0.1.2.3.1.66.3SECTION 250.103
     250.103 Where can I find more information about the requirements in this part
30:2.0.1.2.3.1.66.4SECTION 250.104
     250.104 How may I appeal a decision made under BSEE regulations
30:2.0.1.2.3.1.66.5SECTION 250.105
     250.105 Definitions.
30:2.0.1.2.3.1.67SUBJGRP 67
  Performance Standards
30:2.0.1.2.3.1.67.6SECTION 250.106
     250.106 What standards will the Director use to regulate lease operations
30:2.0.1.2.3.1.67.7SECTION 250.107
     250.107 What must I do to protect health, safety, property, and the environment
30:2.0.1.2.3.1.67.8SECTION 250.108
     250.108 What requirements must I follow for cranes and other material-handling equipment
30:2.0.1.2.3.1.67.9SECTION 250.109
     250.109 What documents must I prepare and maintain related to welding
30:2.0.1.2.3.1.67.10SECTION 250.110
     250.110 What must I include in my welding plan
30:2.0.1.2.3.1.67.11SECTION 250.111
     250.111 Who oversees operations under my welding plan
30:2.0.1.2.3.1.67.12SECTION 250.112
     250.112 What standards must my welding equipment meet
30:2.0.1.2.3.1.67.13SECTION 250.113
     250.113 What procedures must I follow when welding
30:2.0.1.2.3.1.67.14SECTION 250.114
     250.114 How must I install, maintain, and operate electrical equipment
30:2.0.1.2.3.1.67.15SECTION 250.115
     250.115 What are the procedures for, and effects of, incorporation of documents by reference in this part
30:2.0.1.2.3.1.67.16SECTION 250.116-250.117
     250.116-250.117 [Reserved]
30:2.0.1.2.3.1.68SUBJGRP 68
  Gas Storage or Injection
30:2.0.1.2.3.1.68.17SECTION 250.118
     250.118 Will BSEE approve gas injection
30:2.0.1.2.3.1.68.18SECTION 250.119
     250.119 [Reserved]
30:2.0.1.2.3.1.68.19SECTION 250.120
     250.120 How does injecting, storing, or treating gas affect my royalty payments
30:2.0.1.2.3.1.68.20SECTION 250.121
     250.121 What happens when the reservoir contains both original gas in place and injected gas
30:2.0.1.2.3.1.68.21SECTION 250.122
     250.122 What effect does subsurface storage have on the lease term
30:2.0.1.2.3.1.68.22SECTION 250.123
     250.123 [Reserved]
30:2.0.1.2.3.1.68.23SECTION 250.124
     250.124 Will BSEE approve gas injection into the cap rock containing a sulphur deposit
30:2.0.1.2.3.1.69SUBJGRP 69
  Fees
30:2.0.1.2.3.1.69.24SECTION 250.125
     250.125 Service fees.
30:2.0.1.2.3.1.69.25SECTION 250.126
     250.126 Electronic payment instructions.
30:2.0.1.2.3.1.70SUBJGRP 70
  Inspections of Operations
30:2.0.1.2.3.1.70.26SECTION 250.130
     250.130 Why does BSEE conduct inspections
30:2.0.1.2.3.1.70.27SECTION 250.131
     250.131 Will BSEE notify me before conducting an inspection
30:2.0.1.2.3.1.70.28SECTION 250.132
     250.132 What must I do when BSEE conducts an inspection
30:2.0.1.2.3.1.70.29SECTION 250.133
     250.133 Will BSEE reimburse me for my expenses related to inspections
30:2.0.1.2.3.1.71SUBJGRP 71
  Disqualification
30:2.0.1.2.3.1.71.30SECTION 250.135
     250.135 What will BSEE do if my operating performance is unacceptable
30:2.0.1.2.3.1.71.31SECTION 250.136
     250.136 How will BSEE determine if my operating performance is unacceptable
30:2.0.1.2.3.1.72SUBJGRP 72
  Special Types of Approvals
30:2.0.1.2.3.1.72.32SECTION 250.140
     250.140 When will I receive an oral approval
30:2.0.1.2.3.1.72.33SECTION 250.141
     250.141 May I ever use alternate procedures or equipment
30:2.0.1.2.3.1.72.34SECTION 250.142
     250.142 How do I receive approval for departures
30:2.0.1.2.3.1.72.35SECTION 250.143-250.144
     250.143-250.144 [Reserved]
30:2.0.1.2.3.1.72.36SECTION 250.145
     250.145 How do I designate an agent or a local agent
30:2.0.1.2.3.1.72.37SECTION 250.146
     250.146 Who is responsible for fulfilling leasehold obligations
30:2.0.1.2.3.1.73SUBJGRP 73
  Naming and Identifying Facilities and Wells (Does Not Include MODUs)
30:2.0.1.2.3.1.73.38SECTION 250.150
     250.150 How do I name facilities and wells in the Gulf of Mexico Region
30:2.0.1.2.3.1.73.39SECTION 250.151
     250.151 How do I name facilities in the Pacific Region
30:2.0.1.2.3.1.73.40SECTION 250.152
     250.152 How do I name facilities in the Alaska Region
30:2.0.1.2.3.1.73.41SECTION 250.153
     250.153 Do I have to rename an existing facility or well
30:2.0.1.2.3.1.73.42SECTION 250.154
     250.154 What identification signs must I display
30:2.0.1.2.3.1.73.43SECTION 250.160-250.167
     250.160-250.167 [Reserved]
30:2.0.1.2.3.1.74SUBJGRP 74
  Suspensions
30:2.0.1.2.3.1.74.44SECTION 250.168
     250.168 May operations or production be suspended
30:2.0.1.2.3.1.74.45SECTION 250.169
     250.169 What effect does suspension have on my lease
30:2.0.1.2.3.1.74.46SECTION 250.170
     250.170 How long does a suspension last
30:2.0.1.2.3.1.74.47SECTION 250.171
     250.171 How do I request a suspension
30:2.0.1.2.3.1.74.48SECTION 250.172
     250.172 When may the Regional Supervisor grant or direct an SOO or SOP
30:2.0.1.2.3.1.74.49SECTION 250.173
     250.173 When may the Regional Supervisor direct an SOO or SOP
30:2.0.1.2.3.1.74.50SECTION 250.174
     250.174 When may the Regional Supervisor grant or direct an SOP
30:2.0.1.2.3.1.74.51SECTION 250.175
     250.175 When may the Regional Supervisor grant an SOO
30:2.0.1.2.3.1.74.52SECTION 250.176
     250.176 Does a suspension affect my royalty payment
30:2.0.1.2.3.1.74.53SECTION 250.177
     250.177 What additional requirements may the Regional Supervisor order for a suspension
30:2.0.1.2.3.1.75SUBJGRP 75
  Primary Lease Requirements, Lease Term Extensions, and Lease Cancellations
30:2.0.1.2.3.1.75.54SECTION 250.180
     250.180 What am I required to do to keep my lease term in effect
30:2.0.1.2.3.1.75.55SECTION 250.181-250.185
     250.181-250.185 [Reserved]
30:2.0.1.2.3.1.76SUBJGRP 76
  Information and Reporting Requirements
30:2.0.1.2.3.1.76.56SECTION 250.186
     250.186 What reporting information and report forms must I submit
30:2.0.1.2.3.1.76.57SECTION 250.187
     250.187 What are BSEE's incident reporting requirements
30:2.0.1.2.3.1.76.58SECTION 250.188
     250.188 What incidents must I report to BSEE and when must I report them
30:2.0.1.2.3.1.76.59SECTION 250.189
     250.189 Reporting requirements for incidents requiring immediate notification.
30:2.0.1.2.3.1.76.60SECTION 250.190
     250.190 Reporting requirements for incidents requiring written notification.
30:2.0.1.2.3.1.76.61SECTION 250.191
     250.191 How does BSEE conduct incident investigations
30:2.0.1.2.3.1.76.62SECTION 250.192
     250.192 What reports and statistics must I submit relating to a hurricane, earthquake, or other natural occurrence
30:2.0.1.2.3.1.76.63SECTION 250.193
     250.193 Reports and investigations of possible violations.
30:2.0.1.2.3.1.76.64SECTION 250.194
     250.194 How must I protect archaeological resources
30:2.0.1.2.3.1.76.65SECTION 250.195
     250.195 What notification does BSEE require on the production status of wells
30:2.0.1.2.3.1.76.66SECTION 250.196
     250.196 Reimbursements for reproduction and processing costs.
30:2.0.1.2.3.1.76.67SECTION 250.197
     250.197 Data and information to be made available to the public or for limited inspection.
30:2.0.1.2.3.1.77SUBJGRP 77
  References
30:2.0.1.2.3.1.77.68SECTION 250.198
     250.198 Documents incorporated by reference.
30:2.0.1.2.3.1.77.69SECTION 250.199
     250.199 Paperwork Reduction Act statements - information collection.
30:2.0.1.2.3.2SUBPART B
Subpart B - Plans and Information
30:2.0.1.2.3.2.78SUBJGRP 78
  General Information
30:2.0.1.2.3.2.78.1SECTION 250.200
     250.200 Definitions.
30:2.0.1.2.3.2.78.2SECTION 250.201
     250.201 What plans and information must I submit before I conduct any activities on my lease or unit
30:2.0.1.2.3.2.78.3SECTION 250.202-250.203
     250.202-250.203 [Reserved]
30:2.0.1.2.3.2.78.4SECTION 250.204
     250.204 How must I protect the rights of the Federal government
30:2.0.1.2.3.2.78.5SECTION 250.205
     250.205 Are there special requirements if my well affects an adjacent property
30:2.0.1.2.3.2.79SUBJGRP 79
  Post-Approval Requirements for the EP, DPP, and DOCD
30:2.0.1.2.3.2.79.6SECTION 250.282
     250.282 Do I have to conduct post-approval monitoring
30:2.0.1.2.3.2.80SUBJGRP 80
  Deepwater Operations Plan (DWOP)
30:2.0.1.2.3.2.80.7SECTION 250.286
     250.286 What is a DWOP
30:2.0.1.2.3.2.80.8SECTION 250.287
     250.287 For what development projects must I submit a DWOP
30:2.0.1.2.3.2.80.9SECTION 250.288
     250.288 When and how must I submit the Conceptual Plan
30:2.0.1.2.3.2.80.10SECTION 250.289
     250.289 What must the Conceptual Plan contain
30:2.0.1.2.3.2.80.11SECTION 250.290
     250.290 What operations require approval of the Conceptual Plan
30:2.0.1.2.3.2.80.12SECTION 250.291
     250.291 When and how must I submit the DWOP
30:2.0.1.2.3.2.80.13SECTION 250.292
     250.292 What must the DWOP contain
30:2.0.1.2.3.2.80.14SECTION 250.293
     250.293 What operations require approval of the DWOP
30:2.0.1.2.3.2.80.15SECTION 250.294
     250.294 May I combine the Conceptual Plan and the DWOP
30:2.0.1.2.3.2.80.16SECTION 250.295
     250.295 When must I revise my DWOP
30:2.0.1.2.3.3SUBPART C
Subpart C - Pollution Prevention and Control
30:2.0.1.2.3.3.81.1SECTION 250.300
     250.300 Pollution prevention.
30:2.0.1.2.3.3.81.2SECTION 250.301
     250.301 Inspection of facilities.
30:2.0.1.2.3.4SUBPART D
Subpart D - Oil and Gas Drilling Operations
30:2.0.1.2.3.4.81SUBJGRP 81
  General Requirements
30:2.0.1.2.3.4.81.1SECTION 250.400
     250.400 General requirements.
30:2.0.1.2.3.4.81.2SECTION 250.401-250.403
     250.401-250.403 [Reserved]
30:2.0.1.2.3.4.81.3SECTION 250.404
     250.404 What are the requirements for the crown block
30:2.0.1.2.3.4.81.4SECTION 250.405
     250.405 What are the safety requirements for diesel engines used on a drilling rig
30:2.0.1.2.3.4.81.5SECTION 250.406
     250.406 [Reserved]
30:2.0.1.2.3.4.81.6SECTION 250.407
     250.407 What tests must I conduct to determine reservoir characteristics
30:2.0.1.2.3.4.81.7SECTION 250.408
     250.408 May I use alternative procedures or equipment during drilling operations
30:2.0.1.2.3.4.81.8SECTION 250.409
     250.409 May I obtain departures from these drilling requirements
30:2.0.1.2.3.4.82SUBJGRP 82
  Applying for a Permit To Drill
30:2.0.1.2.3.4.82.9SECTION 250.410
     250.410 How do I obtain approval to drill a well
30:2.0.1.2.3.4.82.10SECTION 250.411
     250.411 What information must I submit with my application
30:2.0.1.2.3.4.82.11SECTION 250.412
     250.412 What requirements must the location plat meet
30:2.0.1.2.3.4.82.12SECTION 250.413
     250.413 What must my description of well drilling design criteria address
30:2.0.1.2.3.4.82.13SECTION 250.414
     250.414 What must my drilling prognosis include
30:2.0.1.2.3.4.82.14SECTION 250.415
     250.415 What must my casing and cementing programs include
30:2.0.1.2.3.4.82.15SECTION 250.416
     250.416 What must I include in the diverter description
30:2.0.1.2.3.4.82.16SECTION 250.417
     250.417 [Reserved]
30:2.0.1.2.3.4.82.17SECTION 250.418
     250.418 What additional information must I submit with my APD
30:2.0.1.2.3.4.83SUBJGRP 83
  Casing and Cementing Requirements
30:2.0.1.2.3.4.83.18SECTION 250.420
     250.420 What well casing and cementing requirements must I meet
30:2.0.1.2.3.4.83.19SECTION 250.421
     250.421 What are the casing and cementing requirements by type of casing string
30:2.0.1.2.3.4.83.20SECTION 250.422
     250.422 When may I resume drilling after cementing
30:2.0.1.2.3.4.83.21SECTION 250.423
     250.423 What are the requirements for casing and liner installation
30:2.0.1.2.3.4.83.22SECTION 250.424-250.426
     250.424-250.426 [Reserved]
30:2.0.1.2.3.4.83.23SECTION 250.427
     250.427 What are the requirements for pressure integrity tests
30:2.0.1.2.3.4.83.24SECTION 250.428
     250.428 What must I do in certain cementing and casing situations
30:2.0.1.2.3.4.84SUBJGRP 84
  Diverter System Requirements
30:2.0.1.2.3.4.84.25SECTION 250.430
     250.430 When must I install a diverter system
30:2.0.1.2.3.4.84.26SECTION 250.431
     250.431 What are the diverter design and installation requirements
30:2.0.1.2.3.4.84.27SECTION 250.432
     250.432 How do I obtain a departure to diverter design and installation requirements
30:2.0.1.2.3.4.84.28SECTION 250.433
     250.433 What are the diverter actuation and testing requirements
30:2.0.1.2.3.4.84.29SECTION 250.434
     250.434 What are the recordkeeping requirements for diverter actuations and tests
30:2.0.1.2.3.4.84.30SECTION 250.440-250.451
     250.440-250.451 [Reserved]
30:2.0.1.2.3.4.84.31SECTION 250.452
     250.452 What are the real-time monitoring requirements for Arctic OCS exploratory drilling operations
30:2.0.1.2.3.4.85SUBJGRP 85
  Drilling Fluid Requirements
30:2.0.1.2.3.4.85.32SECTION 250.455
     250.455 What are the general requirements for a drilling fluid program
30:2.0.1.2.3.4.85.33SECTION 250.456
     250.456 What safe practices must the drilling fluid program follow
30:2.0.1.2.3.4.85.34SECTION 250.457
     250.457 What equipment is required to monitor drilling fluids
30:2.0.1.2.3.4.85.35SECTION 250.458
     250.458 What quantities of drilling fluids are required
30:2.0.1.2.3.4.85.36SECTION 250.459
     250.459 What are the safety requirements for drilling fluid-handling areas
30:2.0.1.2.3.4.86SUBJGRP 86
  Other Drilling Requirements
30:2.0.1.2.3.4.86.37SECTION 250.460
     250.460 What are the requirements for conducting a well test
30:2.0.1.2.3.4.86.38SECTION 250.461
     250.461 What are the requirements for directional and inclination surveys
30:2.0.1.2.3.4.86.39SECTION 250.462
     250.462 What are the source control, containment, and collocated equipment requirements
30:2.0.1.2.3.4.86.40SECTION 250.463
     250.463 Who establishes field drilling rules
30:2.0.1.2.3.4.87SUBJGRP 87
  Applying for a Permit To Modify and Well Records
30:2.0.1.2.3.4.87.41SECTION 250.465
     250.465 When must I submit an Application for Permit to Modify (APM) or an End of Operations Report to BSEE
30:2.0.1.2.3.4.87.42SECTION 250.466-250.469
     250.466-250.469 [Reserved]
30:2.0.1.2.3.4.88SUBJGRP 88
  Additional Arctic OCS Requirements
30:2.0.1.2.3.4.88.43SECTION 250.470
     250.470 What additional information must I submit with my APD for Arctic OCS exploratory drilling operations
30:2.0.1.2.3.4.88.44SECTION 250.471
     250.471 What are the requirements for Arctic OCS source control and containment
30:2.0.1.2.3.4.88.45SECTION 250.472
     250.472 What are the relief rig requirements for the Arctic OCS
30:2.0.1.2.3.4.88.46SECTION 250.473
     250.473 What must I do to protect health, safety, property, and the environment while operating on the Arctic OCS
30:2.0.1.2.3.4.89SUBJGRP 89
  Hydrogen Sulfide
30:2.0.1.2.3.4.89.47SECTION 250.490
     250.490 Hydrogen sulfide.
30:2.0.1.2.3.5SUBPART E
Subpart E - Oil and Gas Well-Completion Operations
30:2.0.1.2.3.5.90SUBJGRP 90
  Casing Pressure Management
30:2.0.1.2.3.5.90.1SECTION 250.500
     250.500 General requirements.
30:2.0.1.2.3.5.90.2SECTION 250.501
     250.501 Definition.
30:2.0.1.2.3.5.90.3SECTION 250.502
     250.502 [Reserved]
30:2.0.1.2.3.5.90.4SECTION 250.503
     250.503 Emergency shutdown system.
30:2.0.1.2.3.5.90.5SECTION 250.504
     250.504 Hydrogen sulfide.
30:2.0.1.2.3.5.90.6SECTION 250.505
     250.505 Subsea completions.
30:2.0.1.2.3.5.90.7SECTION 250.506-250.508
     250.506-250.508 [Reserved]
30:2.0.1.2.3.5.90.8SECTION 250.509
     250.509 Well-completion structures on fixed platforms.
30:2.0.1.2.3.5.90.9SECTION 250.510
     250.510 Diesel engine air intakes.
30:2.0.1.2.3.5.90.10SECTION 250.511
     250.511 Traveling-block safety device.
30:2.0.1.2.3.5.90.11SECTION 250.512
     250.512 Field well-completion rules.
30:2.0.1.2.3.5.90.12SECTION 250.513
     250.513 Approval and reporting of well-completion operations.
30:2.0.1.2.3.5.90.13SECTION 250.514
     250.514 Well-control fluids, equipment, and operations.
30:2.0.1.2.3.5.90.14SECTION 250.515-250.517
     250.515-250.517 [Reserved]
30:2.0.1.2.3.5.90.15SECTION 250.518
     250.518 Tubing and wellhead equipment.
30:2.0.1.2.3.5.90.16SECTION 250.519
     250.519 What are the requirements for casing pressure management
30:2.0.1.2.3.5.90.17SECTION 250.520
     250.520 How often do I have to monitor for casing pressure
30:2.0.1.2.3.5.90.18SECTION 250.521
     250.521 When do I have to perform a casing diagnostic test
30:2.0.1.2.3.5.90.19SECTION 250.522
     250.522 How do I manage the thermal effects caused by initial production on a newly completed or recompleted well
30:2.0.1.2.3.5.90.20SECTION 250.523
     250.523 When do I have to repeat casing diagnostic testing
30:2.0.1.2.3.5.90.21SECTION 250.524
     250.524 How long do I keep records of casing pressure and diagnostic tests
30:2.0.1.2.3.5.90.22SECTION 250.525
     250.525 When am I required to take action from my casing diagnostic test
30:2.0.1.2.3.5.90.23SECTION 250.526
     250.526 What do I submit if my casing diagnostic test requires action
30:2.0.1.2.3.5.90.24SECTION 250.527
     250.527 What must I include in my notification of corrective action
30:2.0.1.2.3.5.90.25SECTION 250.528
     250.528 What must I include in my casing pressure request
30:2.0.1.2.3.5.90.26SECTION 250.529
     250.529 What are the terms of my casing pressure request
30:2.0.1.2.3.5.90.27SECTION 250.530
     250.530 What if my casing pressure request is denied
30:2.0.1.2.3.5.90.28SECTION 250.531
     250.531 When does my casing pressure request approval become invalid
30:2.0.1.2.3.6SUBPART F
Subpart F - Oil and Gas Well-Workover Operations
30:2.0.1.2.3.6.91.1SECTION 250.600
     250.600 General requirements.
30:2.0.1.2.3.6.91.2SECTION 250.601
     250.601 Definitions.
30:2.0.1.2.3.6.91.3SECTION 250.602
     250.602 [Reserved]
30:2.0.1.2.3.6.91.4SECTION 250.603
     250.603 Emergency shutdown system.
30:2.0.1.2.3.6.91.5SECTION 250.604
     250.604 Hydrogen sulfide.
30:2.0.1.2.3.6.91.6SECTION 250.605
     250.605 Subsea workovers.
30:2.0.1.2.3.6.91.7SECTION 250.606-250.608
     250.606-250.608 [Reserved]
30:2.0.1.2.3.6.91.8SECTION 250.609
     250.609 Well-workover structures on fixed platforms.
30:2.0.1.2.3.6.91.9SECTION 250.610
     250.610 Diesel engine air intakes.
30:2.0.1.2.3.6.91.10SECTION 250.611
     250.611 Traveling-block safety device.
30:2.0.1.2.3.6.91.11SECTION 250.612
     250.612 Field well-workover rules.
30:2.0.1.2.3.6.91.12SECTION 250.613
     250.613 Approval and reporting for well-workover operations.
30:2.0.1.2.3.6.91.13SECTION 250.614
     250.614 Well-control fluids, equipment, and operations.
30:2.0.1.2.3.6.91.14SECTION 250.615-250.618
     250.615-250.618 [Reserved]
30:2.0.1.2.3.6.91.15SECTION 250.619
     250.619 Tubing and wellhead equipment.
30:2.0.1.2.3.6.91.16SECTION 250.620
     250.620 Wireline operations.
30:2.0.1.2.3.7SUBPART G
Subpart G - Well Operations and Equipment
30:2.0.1.2.3.7.91SUBJGRP 91
  General Requirements
30:2.0.1.2.3.7.91.1SECTION 250.700
     250.700 What operations and equipment does this subpart cover
30:2.0.1.2.3.7.91.2SECTION 250.701
     250.701 May I use alternate procedures or equipment during operations
30:2.0.1.2.3.7.91.3SECTION 250.702
     250.702 May I obtain departures from these requirements
30:2.0.1.2.3.7.91.4SECTION 250.703
     250.703 What must I do to keep wells under control
30:2.0.1.2.3.7.92SUBJGRP 92
  Rig Requirements
30:2.0.1.2.3.7.92.5SECTION 250.710
     250.710 What instructions must be given to personnel engaged in well operations
30:2.0.1.2.3.7.92.6SECTION 250.711
     250.711 What are the requirements for well-control drills
30:2.0.1.2.3.7.92.7SECTION 250.712
     250.712 What rig unit movements must I report
30:2.0.1.2.3.7.92.8SECTION 250.713
     250.713 What must I provide if I plan to use a mobile offshore drilling unit (MODU) for well operations
30:2.0.1.2.3.7.92.9SECTION 250.714
     250.714 Do I have to develop a dropped objects plan
30:2.0.1.2.3.7.92.10SECTION 250.715
     250.715 Do I need a global positioning system (GPS) for all MODUs
30:2.0.1.2.3.7.93SUBJGRP 93
  Well Operations
30:2.0.1.2.3.7.93.11SECTION 250.720
     250.720 When and how must I secure a well
30:2.0.1.2.3.7.93.12SECTION 250.721
     250.721 What are the requirements for pressure testing casing and liners
30:2.0.1.2.3.7.93.13SECTION 250.722
     250.722 What are the requirements for prolonged operations in a well
30:2.0.1.2.3.7.93.14SECTION 250.723
     250.723 What additional safety measures must I take when I conduct operations on a platform that has producing wells or has other hydrocarbon flow
30:2.0.1.2.3.7.93.15SECTION 250.724
     250.724 What are the real-time monitoring requirements
30:2.0.1.2.3.7.94SUBJGRP 94
  Blowout Preventer (BOP) System Requirements
30:2.0.1.2.3.7.94.16SECTION 250.730
     250.730 What are the general requirements for BOP systems and system components
30:2.0.1.2.3.7.94.17SECTION 250.731
     250.731 What information must I submit for BOP systems and system components
30:2.0.1.2.3.7.94.18SECTION 250.732
     250.732 What are the independent third party requirements for BOP systems and system components
30:2.0.1.2.3.7.94.19SECTION 250.733
     250.733 What are the requirements for a surface BOP stack
30:2.0.1.2.3.7.94.20SECTION 250.734
     250.734 What are the requirements for a subsea BOP system
30:2.0.1.2.3.7.94.21SECTION 250.735
     250.735 What associated systems and related equipment must all BOP systems include
30:2.0.1.2.3.7.94.22SECTION 250.736
     250.736 What are the requirements for choke manifolds, kelly-type valves inside BOPs, and drill string safety valves
30:2.0.1.2.3.7.94.23SECTION 250.737
     250.737 What are the BOP system testing requirements
30:2.0.1.2.3.7.94.24SECTION 250.738
     250.738 What must I do in certain situations involving BOP equipment or systems
30:2.0.1.2.3.7.94.25SECTION 250.739
     250.739 What are the BOP maintenance and inspection requirements
30:2.0.1.2.3.7.95SUBJGRP 95
  Records and Reporting
30:2.0.1.2.3.7.95.26SECTION 250.740
     250.740 What records must I keep
30:2.0.1.2.3.7.95.27SECTION 250.741
     250.741 How long must I keep records
30:2.0.1.2.3.7.95.28SECTION 250.742
     250.742 What well records am I required to submit
30:2.0.1.2.3.7.95.29SECTION 250.743
     250.743 What are the well activity reporting requirements
30:2.0.1.2.3.7.95.30SECTION 250.744
     250.744 What are the end of operation reporting requirements
30:2.0.1.2.3.7.95.31SECTION 250.745
     250.745 What other well records could I be required to submit
30:2.0.1.2.3.7.95.32SECTION 250.746
     250.746 What are the recordkeeping requirements for casing, liner, and BOP tests, and inspections of BOP systems and marine risers
30:2.0.1.2.3.7.96SUBJGRP 96
  Coiled Tubing Operations
30:2.0.1.2.3.7.96.33SECTION 250.750
     250.750 What are the coiled tubing requirements
30:2.0.1.2.3.7.96.34SECTION 250.751
     250.751 Coiled tubing testing requirements.
30:2.0.1.2.3.7.97SUBJGRP 97
  Snubbing Operations
30:2.0.1.2.3.7.97.35SECTION 250.760
     250.760 What are the snubbing requirements
30:2.0.1.2.3.8SUBPART H
Subpart H - Oil and Gas Production Safety Systems
30:2.0.1.2.3.8.98SUBJGRP 98
  General Requirements
30:2.0.1.2.3.8.98.1SECTION 250.800
     250.800 General.
30:2.0.1.2.3.8.98.2SECTION 250.801
     250.801 Safety and pollution prevention equipment (SPPE) certification.
30:2.0.1.2.3.8.98.3SECTION 250.802
     250.802 Requirements for SPPE.
30:2.0.1.2.3.8.98.4SECTION 250.803
     250.803 What SPPE failure reporting procedures must I follow
30:2.0.1.2.3.8.98.5SECTION 250.804
     250.804 Additional requirements for subsurface safety valves (SSSVs) and related equipment installed in high pressure high temperature (HPHT) environments.
30:2.0.1.2.3.8.98.6SECTION 250.805
     250.805 Hydrogen sulfide.
30:2.0.1.2.3.8.98.7SECTION 250.806-250.809
     250.806-250.809 [Reserved] 2
30:2.0.1.2.3.8.99SUBJGRP 99
  Surface and Subsurface Safety Systems - Dry Trees
30:2.0.1.2.3.8.99.8SECTION 250.810
     250.810 Dry tree subsurface safety devices - general.
30:2.0.1.2.3.8.99.9SECTION 250.811
     250.811 Specifications for SSSVs - dry trees.
30:2.0.1.2.3.8.99.10SECTION 250.812
     250.812 Surface-controlled SSSVs - dry trees.
30:2.0.1.2.3.8.99.11SECTION 250.813
     250.813 Subsurface-controlled SSSVs.
30:2.0.1.2.3.8.99.12SECTION 250.814
     250.814 Design, installation, and operation of SSSVs - dry trees.
30:2.0.1.2.3.8.99.13SECTION 250.815
     250.815 Subsurface safety devices in shut-in wells - dry trees.
30:2.0.1.2.3.8.99.14SECTION 250.816
     250.816 Subsurface safety devices in injection wells - dry trees.
30:2.0.1.2.3.8.99.15SECTION 250.817
     250.817 Temporary removal of subsurface safety devices for routine operations.
30:2.0.1.2.3.8.99.16SECTION 250.818
     250.818 Additional safety equipment - dry trees.
30:2.0.1.2.3.8.99.17SECTION 250.819
     250.819 Specification for surface safety valves (SSVs).
30:2.0.1.2.3.8.99.18SECTION 250.820
     250.820 Use of SSVs.
30:2.0.1.2.3.8.99.19SECTION 250.821
     250.821 Emergency action and safety system shutdown - dry trees.
30:2.0.1.2.3.8.99.20SECTION 250.822-250.824
     250.822-250.824 [Reserved]
30:2.0.1.2.3.8.100SUBJGRP 100
  Subsea and Subsurface Safety Systems - Subsea Trees
30:2.0.1.2.3.8.100.21SECTION 250.825
     250.825 Subsea tree subsurface safety devices - general.
30:2.0.1.2.3.8.100.22SECTION 250.826
     250.826 Specifications for SSSVs - subsea trees.
30:2.0.1.2.3.8.100.23SECTION 250.827
     250.827 Surface-controlled SSSVs - subsea trees.
30:2.0.1.2.3.8.100.24SECTION 250.828
     250.828 Design, installation, and operation of SSSVs - subsea trees.
30:2.0.1.2.3.8.100.25SECTION 250.829
     250.829 Subsurface safety devices in shut-in wells - subsea trees.
30:2.0.1.2.3.8.100.26SECTION 250.830
     250.830 Subsurface safety devices in injection wells - subsea trees.
30:2.0.1.2.3.8.100.27SECTION 250.831
     250.831 Alteration or disconnection of subsea pipeline or umbilical.
30:2.0.1.2.3.8.100.28SECTION 250.832
     250.832 Additional safety equipment - subsea trees.
30:2.0.1.2.3.8.100.29SECTION 250.833
     250.833 Specification for underwater safety valves (USVs).
30:2.0.1.2.3.8.100.30SECTION 250.834
     250.834 Use of USVs.
30:2.0.1.2.3.8.100.31SECTION 250.835
     250.835 Specification for all boarding shutdown valves (BSDVs) associated with subsea systems.
30:2.0.1.2.3.8.100.32SECTION 250.836
     250.836 Use of BSDVs.
30:2.0.1.2.3.8.100.33SECTION 250.837
     250.837 Emergency action and safety system shutdown - subsea trees.
30:2.0.1.2.3.8.100.34SECTION 250.838
     250.838 What are the maximum allowable valve closure times and hydraulic bleeding requirements for an electro-hydraulic control system
30:2.0.1.2.3.8.100.35SECTION 250.839
     250.839 What are the maximum allowable valve closure times and hydraulic bleeding requirements for a direct-hydraulic control system
30:2.0.1.2.3.8.101SUBJGRP 101
  PRODUCTION SAFETY SYSTEMS
30:2.0.1.2.3.8.101.36SECTION 250.840
     250.840 Design, installation, and maintenance - general.
30:2.0.1.2.3.8.101.37SECTION 250.841
     250.841 Platforms.
30:2.0.1.2.3.8.101.38SECTION 250.842
     250.842 Approval of safety systems design and installation features.
30:2.0.1.2.3.8.101.39SECTION 250.843-250.849
     250.843-250.849 [Reserved]
30:2.0.1.2.3.8.102SUBJGRP 102
  Additional Production System Requirements
30:2.0.1.2.3.8.102.40SECTION 250.850
     250.850 Production system requirements - general.
30:2.0.1.2.3.8.102.41SECTION 250.851
     250.851 Pressure vessels (including heat exchangers) and fired vessels.
30:2.0.1.2.3.8.102.42SECTION 250.852
     250.852 Flowlines/Headers.
30:2.0.1.2.3.8.102.43SECTION 250.853
     250.853 Safety sensors.
30:2.0.1.2.3.8.102.44SECTION 250.854
     250.854 Floating production units equipped with turrets and turret-mounted systems.
30:2.0.1.2.3.8.102.45SECTION 250.855
     250.855 Emergency shutdown (ESD) system.
30:2.0.1.2.3.8.102.46SECTION 250.856
     250.856 Engines.
30:2.0.1.2.3.8.102.47SECTION 250.857
     250.857 Glycol dehydration units.
30:2.0.1.2.3.8.102.48SECTION 250.858
     250.858 Gas compressors.
30:2.0.1.2.3.8.102.49SECTION 250.859
     250.859 Firefighting systems.
30:2.0.1.2.3.8.102.50SECTION 250.860
     250.860 Chemical firefighting system.
30:2.0.1.2.3.8.102.51SECTION 250.861
     250.861 Foam firefighting systems.
30:2.0.1.2.3.8.102.52SECTION 250.862
     250.862 Fire and gas-detection systems.
30:2.0.1.2.3.8.102.53SECTION 250.863
     250.863 Electrical equipment.
30:2.0.1.2.3.8.102.54SECTION 250.864
     250.864 Erosion.
30:2.0.1.2.3.8.102.55SECTION 250.865
     250.865 Surface pumps.
30:2.0.1.2.3.8.102.56SECTION 250.866
     250.866 Personnel safety equipment.
30:2.0.1.2.3.8.102.57SECTION 250.867
     250.867 Temporary quarters and temporary equipment.
30:2.0.1.2.3.8.102.58SECTION 250.868
     250.868 Non-metallic piping.
30:2.0.1.2.3.8.102.59SECTION 250.869
     250.869 General platform operations.
30:2.0.1.2.3.8.102.60SECTION 250.870
     250.870 Time delays on pressure safety low (PSL) sensors.
30:2.0.1.2.3.8.102.61SECTION 250.871
     250.871 Welding and burning practices and procedures.
30:2.0.1.2.3.8.102.62SECTION 250.872
     250.872 Atmospheric vessels.
30:2.0.1.2.3.8.102.63SECTION 250.873
     250.873 Subsea gas lift requirements.
30:2.0.1.2.3.8.102.64SECTION 250.874
     250.874 Subsea water injection systems.
30:2.0.1.2.3.8.102.65SECTION 250.875
     250.875 Subsea pump systems.
30:2.0.1.2.3.8.102.66SECTION 250.876
     250.876 Fired and exhaust heated components.
30:2.0.1.2.3.8.102.67SECTION 250.877-250.879
     250.877-250.879 [Reserved]
30:2.0.1.2.3.8.103SUBJGRP 103
  Safety Device Testing
30:2.0.1.2.3.8.103.68SECTION 250.880
     250.880 Production safety system testing.
30:2.0.1.2.3.8.103.69SECTION 250.881-250.889
     250.881-250.889 [Reserved]
30:2.0.1.2.3.8.104SUBJGRP 104
  Records and Training
30:2.0.1.2.3.8.104.70SECTION 250.890
     250.890 Records.
30:2.0.1.2.3.8.104.71SECTION 250.891
     250.891 Safety device training.
30:2.0.1.2.3.8.104.72SECTION 250.892-250.899
     250.892-250.899 [Reserved]
30:2.0.1.2.3.9SUBPART I
Subpart I - Platforms and Structures
30:2.0.1.2.3.9.105SUBJGRP 105
  General Requirements for Platforms
30:2.0.1.2.3.9.105.1SECTION 250.900
     250.900 What general requirements apply to all platforms
30:2.0.1.2.3.9.105.2SECTION 250.901
     250.901 What industry standards must your platform meet
30:2.0.1.2.3.9.105.3SECTION 250.902
     250.902 What are the requirements for platform removal and location clearance
30:2.0.1.2.3.9.105.4SECTION 250.903
     250.903 What records must I keep
30:2.0.1.2.3.9.106SUBJGRP 106
  Platform Approval Program
30:2.0.1.2.3.9.106.5SECTION 250.904
     250.904 What is the Platform Approval Program
30:2.0.1.2.3.9.106.6SECTION 250.905
     250.905 How do I get approval for the installation, modification, or repair of my platform
30:2.0.1.2.3.9.106.7SECTION 250.906
     250.906 What must I do to obtain approval for the proposed site of my platform
30:2.0.1.2.3.9.106.8SECTION 250.907
     250.907 Where must I locate foundation boreholes
30:2.0.1.2.3.9.106.9SECTION 250.908
     250.908 What are the minimum structural fatigue design requirements
30:2.0.1.2.3.9.107SUBJGRP 107
  Platform Verification Program
30:2.0.1.2.3.9.107.10SECTION 250.909
     250.909 What is the Platform Verification Program
30:2.0.1.2.3.9.107.11SECTION 250.910
     250.910 Which of my facilities are subject to the Platform Verification Program
30:2.0.1.2.3.9.107.12SECTION 250.911
     250.911 If my platform is subject to the Platform Verification Program, what must I do
30:2.0.1.2.3.9.107.13SECTION 250.912
     250.912 What plans must I submit under the Platform Verification Program
30:2.0.1.2.3.9.107.14SECTION 250.913
     250.913 When must I resubmit Platform Verification Program plans
30:2.0.1.2.3.9.107.15SECTION 250.914
     250.914 How do I nominate a CVA
30:2.0.1.2.3.9.107.16SECTION 250.915
     250.915 What are the CVA's primary responsibilities
30:2.0.1.2.3.9.107.17SECTION 250.916
     250.916 What are the CVA's primary duties during the design phase
30:2.0.1.2.3.9.107.18SECTION 250.917
     250.917 What are the CVA's primary duties during the fabrication phase
30:2.0.1.2.3.9.107.19SECTION 250.918
     250.918 What are the CVA's primary duties during the installation phase
30:2.0.1.2.3.9.108SUBJGRP 108
  Inspection, Maintenance, and Assessment of Platforms
30:2.0.1.2.3.9.108.20SECTION 250.919
     250.919 What in-service inspection requirements must I meet
30:2.0.1.2.3.9.108.21SECTION 250.920
     250.920 What are the BSEE requirements for assessment of fixed platforms
30:2.0.1.2.3.9.108.22SECTION 250.921
     250.921 How do I analyze my platform for cumulative fatigue
30:2.0.1.2.3.10SUBPART J
Subpart J - Pipelines and Pipeline Rights-of-Way
30:2.0.1.2.3.10.109.1SECTION 250.1000
     250.1000 General requirements.
30:2.0.1.2.3.10.109.2SECTION 250.1001
     250.1001 Definitions.
30:2.0.1.2.3.10.109.3SECTION 250.1002
     250.1002 Design requirements for DOI pipelines.
30:2.0.1.2.3.10.109.4SECTION 250.1003
     250.1003 Installation, testing, and repair requirements for DOI pipelines.
30:2.0.1.2.3.10.109.5SECTION 250.1004
     250.1004 Safety equipment requirements for DOI pipelines.
30:2.0.1.2.3.10.109.6SECTION 250.1005
     250.1005 Inspection requirements for DOI pipelines.
30:2.0.1.2.3.10.109.7SECTION 250.1006
     250.1006 How must I decommission and take out of service a DOI pipeline
30:2.0.1.2.3.10.109.8SECTION 250.1007
     250.1007 What to include in applications.
30:2.0.1.2.3.10.109.9SECTION 250.1008
     250.1008 Reports.
30:2.0.1.2.3.10.109.10SECTION 250.1009
     250.1009 Requirements to obtain pipeline right-of-way grants.
30:2.0.1.2.3.10.109.11SECTION 250.1010
     250.1010 General requirements for pipeline right-of-way holders.
30:2.0.1.2.3.10.109.12SECTION 250.1011
     250.1011 [Reserved]
30:2.0.1.2.3.10.109.13SECTION 250.1012
     250.1012 Required payments for pipeline right-of-way holders.
30:2.0.1.2.3.10.109.14SECTION 250.1013
     250.1013 Grounds for forfeiture of pipeline right-of-way grants.
30:2.0.1.2.3.10.109.15SECTION 250.1014
     250.1014 When pipeline right-of-way grants expire.
30:2.0.1.2.3.10.109.16SECTION 250.1015
     250.1015 Applications for pipeline right-of-way grants.
30:2.0.1.2.3.10.109.17SECTION 250.1016
     250.1016 Granting pipeline rights-of-way.
30:2.0.1.2.3.10.109.18SECTION 250.1017
     250.1017 Requirements for construction under pipeline right-of-way grants.
30:2.0.1.2.3.10.109.19SECTION 250.1018
     250.1018 Assignment of pipeline right-of-way grants.
30:2.0.1.2.3.10.109.20SECTION 250.1019
     250.1019 Relinquishment of pipeline right-of-way grants.
30:2.0.1.2.3.11SUBPART K
Subpart K - Oil and Gas Production Requirements
30:2.0.1.2.3.11.109SUBJGRP 109
  General
30:2.0.1.2.3.11.109.1SECTION 250.1150
     250.1150 What are the general reservoir production requirements
30:2.0.1.2.3.11.110SUBJGRP 110
  Well Tests and Surveys
30:2.0.1.2.3.11.110.2SECTION 250.1151
     250.1151 How often must I conduct well production tests
30:2.0.1.2.3.11.110.3SECTION 250.1152
     250.1152 How do I conduct well tests
30:2.0.1.2.3.11.110.4SECTION 250.1153-250.1155
     250.1153-250.1155 [Reserved]
30:2.0.1.2.3.11.111SUBJGRP 111
  Approvals Prior to Production
30:2.0.1.2.3.11.111.5SECTION 250.1156
     250.1156 What steps must I take to receive approval to produce within 500 feet of a unit or lease line
30:2.0.1.2.3.11.111.6SECTION 250.1157
     250.1157 How do I receive approval to produce gas-cap gas from an oil reservoir with an associated gas cap
30:2.0.1.2.3.11.111.7SECTION 250.1158
     250.1158 How do I receive approval to downhole commingle hydrocarbons
30:2.0.1.2.3.11.112SUBJGRP 112
  Production Rates
30:2.0.1.2.3.11.112.8SECTION 250.1159
     250.1159 May the Regional Supervisor limit my well or reservoir production rates
30:2.0.1.2.3.11.113SUBJGRP 113
  Flaring, Venting, and Burning Hydrocarbons
30:2.0.1.2.3.11.113.9SECTION 250.1160
     250.1160 When may I flare or vent gas
30:2.0.1.2.3.11.113.10SECTION 250.1161
     250.1161 When may I flare or vent gas for extended periods of time
30:2.0.1.2.3.11.113.11SECTION 250.1162
     250.1162 When may I burn produced liquid hydrocarbons
30:2.0.1.2.3.11.113.12SECTION 250.1163
     250.1163 How must I measure gas flaring or venting volumes and liquid hydrocarbon burning volumes, and what records must I maintain
30:2.0.1.2.3.11.113.13SECTION 250.1164
     250.1164 What are the requirements for flaring or venting gas containing H2S
30:2.0.1.2.3.11.114SUBJGRP 114
  Other Requirements
30:2.0.1.2.3.11.114.14SECTION 250.1165
     250.1165 What must I do for enhanced recovery operations
30:2.0.1.2.3.11.114.15SECTION 250.1166
     250.1166 What additional reporting is required for developments in the Alaska OCS Region
30:2.0.1.2.3.11.114.16SECTION 250.1167
     250.1167 What information must I submit with forms and for approvals
30:2.0.1.2.3.12SUBPART L
Subpart L - Oil and Gas Production Measurement, Surface Commingling, and Security
30:2.0.1.2.3.12.115.1SECTION 250.1200
     250.1200 Question index table.
30:2.0.1.2.3.12.115.2SECTION 250.1201
     250.1201 Definitions.
30:2.0.1.2.3.12.115.3SECTION 250.1202
     250.1202 Liquid hydrocarbon measurement.
30:2.0.1.2.3.12.115.4SECTION 250.1203
     250.1203 Gas measurement.
30:2.0.1.2.3.12.115.5SECTION 250.1204
     250.1204 Surface commingling.
30:2.0.1.2.3.12.115.6SECTION 250.1205
     250.1205 Site security.
30:2.0.1.2.3.13SUBPART M
Subpart M - Unitization
30:2.0.1.2.3.13.115.1SECTION 250.1300
     250.1300 What is the purpose of this subpart
30:2.0.1.2.3.13.115.2SECTION 250.1301
     250.1301 What are the requirements for unitization
30:2.0.1.2.3.13.115.3SECTION 250.1302
     250.1302 What if I have a competitive reservoir on a lease
30:2.0.1.2.3.13.115.4SECTION 250.1303
     250.1303 How do I apply for voluntary unitization
30:2.0.1.2.3.13.115.5SECTION 250.1304
     250.1304 How will BSEE require unitization
30:2.0.1.2.3.14SUBPART N
Subpart N - Outer Continental Shelf Civil Penalties
30:2.0.1.2.3.14.115SUBJGRP 115
  Outer Continental Shelf Lands Act Civil Penalties
30:2.0.1.2.3.14.115.1SECTION 250.1400
     250.1400 How does BSEE begin the civil penalty process
30:2.0.1.2.3.14.115.2SECTION 250.1401
     250.1401 [Reserved]
30:2.0.1.2.3.14.115.3SECTION 250.1402
     250.1402 Definitions.
30:2.0.1.2.3.14.115.4SECTION 250.1403
     250.1403 What is the maximum civil penalty
30:2.0.1.2.3.14.115.5SECTION 250.1404
     250.1404 Which violations will BSEE review for potential civil penalties
30:2.0.1.2.3.14.115.6SECTION 250.1405
     250.1405 When is a case file developed
30:2.0.1.2.3.14.115.7SECTION 250.1406
     250.1406 When will BSEE notify me and provide penalty information
30:2.0.1.2.3.14.115.8SECTION 250.1407
     250.1407 How do I respond to the letter of notification
30:2.0.1.2.3.14.115.9SECTION 250.1408
     250.1408 When will I be notified of the Reviewing Officer's decision
30:2.0.1.2.3.14.115.10SECTION 250.1409
     250.1409 What are my appeal rights
30:2.0.1.2.3.14.116SUBJGRP 116
  Federal Oil and Gas Royalty Management Act Civil Penalties Definitions
30:2.0.1.2.3.14.116.11SECTION 250.1450
     250.1450 What definitions apply to this subpart
30:2.0.1.2.3.14.117SUBJGRP 117
  Penalties After a Period To Correct
30:2.0.1.2.3.14.117.12SECTION 250.1451
     250.1451 What may BSEE do if I violate a statute, regulation, order, or lease term relating to a Federal oil and gas lease
30:2.0.1.2.3.14.117.13SECTION 250.1452
     250.1452 What if I correct the violation
30:2.0.1.2.3.14.117.14SECTION 250.1453
     250.1453 What if I do not correct the violation
30:2.0.1.2.3.14.117.15SECTION 250.1454
     250.1454 How may I request a hearing on the record on a Notice of Noncompliance
30:2.0.1.2.3.14.117.16SECTION 250.1455
     250.1455 Does my request for a hearing on the record affect the penalties
30:2.0.1.2.3.14.117.17SECTION 250.1456
     250.1456 May I request a hearing on the record regarding the amount of a civil penalty if I did not request a hearing on the Notice of Noncompliance
30:2.0.1.2.3.14.118SUBJGRP 118
  Penalties Without a Period To Correct
30:2.0.1.2.3.14.118.18SECTION 250.1460
     250.1460 May I be subject to penalties without prior notice and an opportunity to correct
30:2.0.1.2.3.14.118.19SECTION 250.1461
     250.1461 How will BSEE inform me of violations without a period to correct
30:2.0.1.2.3.14.118.20SECTION 250.1462
     250.1462 How may I request a hearing on the record on a Notice of Noncompliance regarding violations without a period to correct
30:2.0.1.2.3.14.118.21SECTION 250.1463
     250.1463 Does my request for a hearing on the record affect the penalties
30:2.0.1.2.3.14.118.22SECTION 250.1464
     250.1464 May I request a hearing on the record regarding the amount of a civil penalty if I did not request a hearing on the Notice of Noncompliance
30:2.0.1.2.3.14.119SUBJGRP 119
  General Provisions
30:2.0.1.2.3.14.119.23SECTION 250.1470
     250.1470 How does BSEE decide what the amount of the penalty should be
30:2.0.1.2.3.14.119.24SECTION 250.1471
     250.1471 Does the penalty affect whether I owe interest
30:2.0.1.2.3.14.119.25SECTION 250.1472
     250.1472 How will the Office of Hearings and Appeals conduct the hearing on the record
30:2.0.1.2.3.14.119.26SECTION 250.1473
     250.1473 How may I appeal the Administrative Law Judge's decision
30:2.0.1.2.3.14.119.27SECTION 250.1474
     250.1474 May I seek judicial review of the decision of the Interior Board of Land Appeals
30:2.0.1.2.3.14.119.28SECTION 250.1475
     250.1475 When must I pay the penalty
30:2.0.1.2.3.14.119.29SECTION 250.1476
     250.1476 Can BSEE reduce my penalty once it is assessed
30:2.0.1.2.3.14.119.30SECTION 250.1477
     250.1477 How may BSEE collect the penalty
30:2.0.1.2.3.14.120SUBJGRP 120
  Criminal Penalties
30:2.0.1.2.3.14.120.31SECTION 250.1480
     250.1480 May the United States criminally prosecute me for violations under Federal oil and gas leases
30:2.0.1.2.3.15SUBPART O
Subpart O - Well Control and Production Safety Training
30:2.0.1.2.3.15.121.1SECTION 250.1500
     250.1500 Definitions.
30:2.0.1.2.3.15.121.2SECTION 250.1501
     250.1501 What is the goal of my training program
30:2.0.1.2.3.15.121.3SECTION 250.1503
     250.1503 What are my general responsibilities for training
30:2.0.1.2.3.15.121.4SECTION 250.1504
     250.1504 May I use alternative training methods
30:2.0.1.2.3.15.121.5SECTION 250.1505
     250.1505 Where may I get training for my employees
30:2.0.1.2.3.15.121.6SECTION 250.1506
     250.1506 How often must I train my employees
30:2.0.1.2.3.15.121.7SECTION 250.1507
     250.1507 How will BSEE measure training results
30:2.0.1.2.3.15.121.8SECTION 250.1508
     250.1508 What must I do when BSEE administers written or oral tests
30:2.0.1.2.3.15.121.9SECTION 250.1509
     250.1509 What must I do when BSEE administers or requires hands-on, simulator, or other types of testing
30:2.0.1.2.3.15.121.10SECTION 250.1510
     250.1510 What will BSEE do if my training program does not comply with this subpart
30:2.0.1.2.3.16SUBPART P
Subpart P - Sulphur Operations
30:2.0.1.2.3.16.121.1SECTION 250.1600
     250.1600 Performance standard.
30:2.0.1.2.3.16.121.2SECTION 250.1601
     250.1601 Definitions.
30:2.0.1.2.3.16.121.3SECTION 250.1602
     250.1602 Applicability.
30:2.0.1.2.3.16.121.4SECTION 250.1603
     250.1603 Determination of sulphur deposit.
30:2.0.1.2.3.16.121.5SECTION 250.1604
     250.1604 General requirements.
30:2.0.1.2.3.16.121.6SECTION 250.1605
     250.1605 Drilling requirements.
30:2.0.1.2.3.16.121.7SECTION 250.1606
     250.1606 Control of wells.
30:2.0.1.2.3.16.121.8SECTION 250.1607
     250.1607 Field rules.
30:2.0.1.2.3.16.121.9SECTION 250.1608
     250.1608 Well casing and cementing.
30:2.0.1.2.3.16.121.10SECTION 250.1609
     250.1609 Pressure testing of casing.
30:2.0.1.2.3.16.121.11SECTION 250.1610
     250.1610 Blowout preventer systems and system components.
30:2.0.1.2.3.16.121.12SECTION 250.1611
     250.1611 Blowout preventer systems tests, actuations, inspections, and maintenance.
30:2.0.1.2.3.16.121.13SECTION 250.1612
     250.1612 Well-control drills.
30:2.0.1.2.3.16.121.14SECTION 250.1613
     250.1613 Diverter systems.
30:2.0.1.2.3.16.121.15SECTION 250.1614
     250.1614 Mud program.
30:2.0.1.2.3.16.121.16SECTION 250.1615
     250.1615 Securing of wells.
30:2.0.1.2.3.16.121.17SECTION 250.1616
     250.1616 Supervision, surveillance, and training.
30:2.0.1.2.3.16.121.18SECTION 250.1617
     250.1617 Application for permit to drill.
30:2.0.1.2.3.16.121.19SECTION 250.1618
     250.1618 Application for permit to modify.
30:2.0.1.2.3.16.121.20SECTION 250.1619
     250.1619 Well records.
30:2.0.1.2.3.16.121.21SECTION 250.1620
     250.1620 Well-completion and well-workover requirements.
30:2.0.1.2.3.16.121.22SECTION 250.1621
     250.1621 Crew instructions.
30:2.0.1.2.3.16.121.23SECTION 250.1622
     250.1622 Approvals and reporting of well-completion and well-workover operations.
30:2.0.1.2.3.16.121.24SECTION 250.1623
     250.1623 Well-control fluids, equipment, and operations.
30:2.0.1.2.3.16.121.25SECTION 250.1624
     250.1624 Blowout prevention equipment.
30:2.0.1.2.3.16.121.26SECTION 250.1625
     250.1625 Blowout preventer system testing, records, and drills.
30:2.0.1.2.3.16.121.27SECTION 250.1626
     250.1626 Tubing and wellhead equipment.
30:2.0.1.2.3.16.121.28SECTION 250.1627
     250.1627 Production requirements.
30:2.0.1.2.3.16.121.29SECTION 250.1628
     250.1628 Design, installation, and operation of production systems.
30:2.0.1.2.3.16.121.30SECTION 250.1629
     250.1629 Additional production and fuel gas system requirements.
30:2.0.1.2.3.16.121.31SECTION 250.1630
     250.1630 Safety-system testing and records.
30:2.0.1.2.3.16.121.32SECTION 250.1631
     250.1631 Safety device training.
30:2.0.1.2.3.16.121.33SECTION 250.1632
     250.1632 Production rates.
30:2.0.1.2.3.16.121.34SECTION 250.1633
     250.1633 Production measurement.
30:2.0.1.2.3.16.121.35SECTION 250.1634
     250.1634 Site security.
30:2.0.1.2.3.17SUBPART Q
Subpart Q - Decommissioning Activities
30:2.0.1.2.3.17.121SUBJGRP 121
  General
30:2.0.1.2.3.17.121.1SECTION 250.1700
     250.1700 What do the terms “decommissioning”, “obstructions”, and “facility” mean
30:2.0.1.2.3.17.121.2SECTION 250.1701
     250.1701 Who must meet the decommissioning obligations in this subpart
30:2.0.1.2.3.17.121.3SECTION 250.1702
     250.1702 When do I accrue decommissioning obligations
30:2.0.1.2.3.17.121.4SECTION 250.1703
     250.1703 What are the general requirements for decommissioning
30:2.0.1.2.3.17.121.5SECTION 250.1704
     250.1704 What decommissioning applications and reports must I submit and when must I submit them
30:2.0.1.2.3.17.121.6SECTION 250.1705-250.1709
     250.1705-250.1709 [Reserved]
30:2.0.1.2.3.17.122SUBJGRP 122
  Permanently Plugging Wells
30:2.0.1.2.3.17.122.7SECTION 250.1710
     250.1710 When must I permanently plug all wells on a lease
30:2.0.1.2.3.17.122.8SECTION 250.1711
     250.1711 When will BSEE order me to permanently plug a well
30:2.0.1.2.3.17.122.9SECTION 250.1712
     250.1712 What information must I submit before I permanently plug a well or zone
30:2.0.1.2.3.17.122.10SECTION 250.1713
     250.1713 [Reserved]
30:2.0.1.2.3.17.122.11SECTION 250.1714
     250.1714 What must I accomplish with well plugs
30:2.0.1.2.3.17.122.12SECTION 250.1715
     250.1715 How must I permanently plug a well
30:2.0.1.2.3.17.122.13SECTION 250.1716
     250.1716 To what depth must I remove wellheads and casings
30:2.0.1.2.3.17.122.14SECTION 250.1717
     250.1717 [Reserved]
30:2.0.1.2.3.17.123SUBJGRP 123
  Temporary Abandoned Wells
30:2.0.1.2.3.17.123.15SECTION 250.1721
     250.1721 If I temporarily abandon a well that I plan to re-enter, what must I do
30:2.0.1.2.3.17.123.16SECTION 250.1722
     250.1722 If I install a subsea protective device, what requirements must I meet
30:2.0.1.2.3.17.123.17SECTION 250.1723
     250.1723 What must I do when it is no longer necessary to maintain a well in temporary abandoned status
30:2.0.1.2.3.17.124SUBJGRP 124
  Removing Platforms and Other Facilities
30:2.0.1.2.3.17.124.18SECTION 250.1725
     250.1725 When do I have to remove platforms and other facilities
30:2.0.1.2.3.17.124.19SECTION 250.1726
     250.1726 When must I submit an initial platform removal application and what must it include
30:2.0.1.2.3.17.124.20SECTION 250.1727
     250.1727 What information must I include in my final application to remove a platform or other facility
30:2.0.1.2.3.17.124.21SECTION 250.1728
     250.1728 To what depth must I remove a platform or other facility
30:2.0.1.2.3.17.124.22SECTION 250.1729
     250.1729 After I remove a platform or other facility, what information must I submit
30:2.0.1.2.3.17.124.23SECTION 250.1730
     250.1730 When might BSEE approve partial structure removal or toppling in place
30:2.0.1.2.3.17.124.24SECTION 250.1731
     250.1731 Who is responsible for decommissioning an OCS facility subject to an Alternate Use RUE
30:2.0.1.2.3.17.125SUBJGRP 125
  Site Clearance for Wells, Platforms, and Other Facilities
30:2.0.1.2.3.17.125.25SECTION 250.1740
     250.1740 How must I verify that the site of a permanently plugged well, removed platform, or other removed facility is clear of obstructions
30:2.0.1.2.3.17.125.26SECTION 250.1741
     250.1741 If I drag a trawl across a site, what requirements must I meet
30:2.0.1.2.3.17.125.27SECTION 250.1742
     250.1742 What other methods can I use to verify that a site is clear
30:2.0.1.2.3.17.125.28SECTION 250.1743
     250.1743 How do I certify that a site is clear of obstructions
30:2.0.1.2.3.17.126SUBJGRP 126
  Pipeline Decommissioning
30:2.0.1.2.3.17.126.29SECTION 250.1750
     250.1750 When may I decommission a pipeline in place
30:2.0.1.2.3.17.126.30SECTION 250.1751
     250.1751 How do I decommission a pipeline in place
30:2.0.1.2.3.17.126.31SECTION 250.1752
     250.1752 How do I remove a pipeline
30:2.0.1.2.3.17.126.32SECTION 250.1753
     250.1753 After I decommission a pipeline, what information must I submit
30:2.0.1.2.3.17.126.33SECTION 250.1754
     250.1754 When must I remove a pipeline decommissioned in place
30:2.0.1.2.3.18SUBPART R
Subpart R [Reserved]
30:2.0.1.2.3.19SUBPART S
Subpart S - Safety and Environmental Management Systems (SEMS)
30:2.0.1.2.3.19.127.1SECTION 250.1900
     250.1900 Must I have a SEMS program
30:2.0.1.2.3.19.127.2SECTION 250.1901
     250.1901 What is the goal of my SEMS program
30:2.0.1.2.3.19.127.3SECTION 250.1902
     250.1902 What must I include in my SEMS program
30:2.0.1.2.3.19.127.4SECTION 250.1903
     250.1903 Acronyms and definitions.
30:2.0.1.2.3.19.127.5SECTION 250.1904
     250.1904 Special instructions.
30:2.0.1.2.3.19.127.6SECTION 250.1905-250.1908
     250.1905-250.1908 [Reserved]
30:2.0.1.2.3.19.127.7SECTION 250.1909
     250.1909 What are management's general responsibilities for the SEMS program
30:2.0.1.2.3.19.127.8SECTION 250.1910
     250.1910 What safety and environmental information is required
30:2.0.1.2.3.19.127.9SECTION 250.1911
     250.1911 What hazards analysis criteria must my SEMS program meet
30:2.0.1.2.3.19.127.10SECTION 250.1912
     250.1912 What criteria for management of change must my SEMS program meet
30:2.0.1.2.3.19.127.11SECTION 250.1913
     250.1913 What criteria for operating procedures must my SEMS program meet
30:2.0.1.2.3.19.127.12SECTION 250.1914
     250.1914 What criteria must be documented in my SEMS program for safe work practices and contractor selection
30:2.0.1.2.3.19.127.13SECTION 250.1915
     250.1915 What training criteria must be in my SEMS program
30:2.0.1.2.3.19.127.14SECTION 250.1916
     250.1916 What criteria for mechanical integrity must my SEMS program meet
30:2.0.1.2.3.19.127.15SECTION 250.1917
     250.1917 What criteria for pre-startup review must be in my SEMS program
30:2.0.1.2.3.19.127.16SECTION 250.1918
     250.1918 What criteria for emergency response and control must be in my SEMS program
30:2.0.1.2.3.19.127.17SECTION 250.1919
     250.1919 What criteria for investigation of incidents must be in my SEMS program
30:2.0.1.2.3.19.127.18SECTION 250.1920
     250.1920 What are the auditing requirements for my SEMS program
30:2.0.1.2.3.19.127.19SECTION 250.1921
     250.1921 What qualifications must the ASP meet
30:2.0.1.2.3.19.127.20SECTION 250.1922
     250.1922 What qualifications must an AB meet
30:2.0.1.2.3.19.127.21SECTION 250.1923
     250.1923 [Reserved]
30:2.0.1.2.3.19.127.22SECTION 250.1924
     250.1924 How will BSEE determine if my SEMS program is effective
30:2.0.1.2.3.19.127.23SECTION 250.1925
     250.1925 May BSEE direct me to conduct additional audits
30:2.0.1.2.3.19.127.24SECTION 250.1926
     250.1926 [Reserved]
30:2.0.1.2.3.19.127.25SECTION 250.1927
     250.1927 What happens if BSEE finds shortcomings in my SEMS program
30:2.0.1.2.3.19.127.26SECTION 250.1928
     250.1928 What are my recordkeeping and documentation requirements
30:2.0.1.2.3.19.127.27SECTION 250.1929
     250.1929 What are my responsibilities for submitting OCS performance measure data
30:2.0.1.2.3.19.127.28SECTION 250.1930
     250.1930 What must be included in my SEMS program for SWA
30:2.0.1.2.3.19.127.29SECTION 250.1931
     250.1931 What must be included in my SEMS program for UWA
30:2.0.1.2.3.19.127.30SECTION 250.1932
     250.1932 What are my EPP requirements
30:2.0.1.2.3.19.127.31SECTION 250.1933
     250.1933 What procedures must be included for reporting unsafe working conditions
30:2.0.1.2.4PART 251
PART 251 - GEOLOGICAL AND GEOPHYSICAL (G&G) EXPLORATIONS OF THE OUTER CONTINENTAL SHELF
30:2.0.1.2.4.0.127.1SECTION 251.1
     251.1 Definitions.
30:2.0.1.2.4.0.127.2SECTION 251.2
     251.2 [Reserved]
30:2.0.1.2.4.0.127.3SECTION 251.3
     251.3 Authority and applicability of this part.
30:2.0.1.2.4.0.127.4SECTION 251.4-251.6
     251.4-251.6 [Reserved]
30:2.0.1.2.4.0.127.5SECTION 251.7
     251.7 Test drilling activities under a permit.
30:2.0.1.2.4.0.127.6SECTION 251.8-251.14
     251.8-251.14 [Reserved]
30:2.0.1.2.4.0.127.7SECTION 251.15
     251.15 Authority for information collection.
30:2.0.1.2.5PART 252
PART 252 - OUTER CONTINENTAL SHELF (OCS) OIL AND GAS INFORMATION PROGRAM
30:2.0.1.2.5.0.127.1SECTION 252.1
     252.1 Purpose.
30:2.0.1.2.5.0.127.2SECTION 252.2
     252.2 Definitions.
30:2.0.1.2.5.0.127.3SECTION 252.3
     252.3 Oil and gas data and information to be provided for use in the OCS Oil and Gas Information Program.
30:2.0.1.2.5.0.127.4SECTION 252.4
     252.4 Summary Report to affected States.
30:2.0.1.2.5.0.127.5SECTION 252.5
     252.5 Information to be made available to affected States.
30:2.0.1.2.5.0.127.6SECTION 252.6
     252.6 Freedom of Information Act requirements.
30:2.0.1.2.5.0.127.7SECTION 252.7
     252.7 Privileged and proprietary data and information to be made available to affected States.
30:2.0.1.2.6PART 253
PART 253 [RESERVED]
30:2.0.1.2.7PART 254
PART 254 - OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE
30:2.0.1.2.7.1SUBPART A
Subpart A - General
30:2.0.1.2.7.1.127.1SECTION 254.1
     254.1 Who must submit an oil spill response plan (OSRP)
30:2.0.1.2.7.1.127.2SECTION 254.2
     254.2 When must I submit an OSRP
30:2.0.1.2.7.1.127.3SECTION 254.3
     254.3 May I cover more than one facility in my OSRP
30:2.0.1.2.7.1.127.4SECTION 254.4
     254.4 May I reference other documents in my OSRP
30:2.0.1.2.7.1.127.5SECTION 254.5
     254.5 General response plan requirements.
30:2.0.1.2.7.1.127.6SECTION 254.6
     254.6 Definitions.
30:2.0.1.2.7.1.127.7SECTION 254.7
     254.7 How do I submit my OSRP to the BSEE
30:2.0.1.2.7.1.127.8SECTION 254.8
     254.8 May I appeal decisions under this part
30:2.0.1.2.7.1.127.9SECTION 254.9
     254.9 Authority for information collection.
30:2.0.1.2.7.2SUBPART B
Subpart B - Oil-Spill Response Plans for Outer Continental Shelf Facilities
30:2.0.1.2.7.2.127.1SECTION 254.20
     254.20 Purpose.
30:2.0.1.2.7.2.127.2SECTION 254.21
     254.21 How must I format my OSRP
30:2.0.1.2.7.2.127.3SECTION 254.22
     254.22 What information must I include in the “Introduction and OSRP contents” section
30:2.0.1.2.7.2.127.4SECTION 254.23
     254.23 What information must I include in the “Emergency response action plan” section
30:2.0.1.2.7.2.127.5SECTION 254.24
     254.24 What information must I include in the “Equipment inventory” appendix
30:2.0.1.2.7.2.127.6SECTION 254.25
     254.25 What information must I include in the “Contractual agreements” appendix
30:2.0.1.2.7.2.127.7SECTION 254.26
     254.26 What information must I include in the “Worst case discharge scenario” appendix
30:2.0.1.2.7.2.127.8SECTION 254.27
     254.27 What information must I include in the “Dispersant use plan” appendix
30:2.0.1.2.7.2.127.9SECTION 254.28
     254.28 What information must I include in the “In situ burning plan” appendix
30:2.0.1.2.7.2.127.10SECTION 254.29
     254.29 What information must I include in the “Training and drills” appendix
30:2.0.1.2.7.2.127.11SECTION 254.30
     254.30 When must I revise my OSRP
30:2.0.1.2.7.3SUBPART C
Subpart C - Related Requirements for Outer Continental Shelf Facilities
30:2.0.1.2.7.3.127.1SECTION 254.40
     254.40 Records.
30:2.0.1.2.7.3.127.2SECTION 254.41
     254.41 Training your response personnel.
30:2.0.1.2.7.3.127.3SECTION 254.42
     254.42 Exercises for your response personnel and equipment.
30:2.0.1.2.7.3.127.4SECTION 254.43
     254.43 Maintenance and periodic inspection of response equipment.
30:2.0.1.2.7.3.127.5SECTION 254.44
     254.44 Calculating response equipment effective daily recovery capacities.
30:2.0.1.2.7.3.127.6SECTION 254.45
     254.45 Verifying the capabilities of your response equipment.
30:2.0.1.2.7.3.127.7SECTION 254.46
     254.46 Whom do I notify if an oil spill occurs
30:2.0.1.2.7.3.127.8SECTION 254.47
     254.47 Determining the volume of oil of your worst case discharge scenario.
30:2.0.1.2.7.4SUBPART D
Subpart D - Oil-Spill Response Requirements for Facilities Located in State Waters Seaward of the Coast Line
30:2.0.1.2.7.4.127.1SECTION 254.50
     254.50 Spill response plans for facilities located in State waters seaward of the coast line.
30:2.0.1.2.7.4.127.2SECTION 254.51
     254.51 Modifying an existing OCS OSRP.
30:2.0.1.2.7.4.127.3SECTION 254.52
     254.52 Following the format for an OCS OSRP.
30:2.0.1.2.7.4.127.4SECTION 254.53
     254.53 Submitting an OSRP developed under State requirements.
30:2.0.1.2.7.4.127.5SECTION 254.54
     254.54 Spill prevention for facilities located in State waters seaward of the coast line.
30:2.0.1.2.7.4.127.6SECTION 254.55
     254.55 Spill response plans for facilities located in Alaska State waters seaward of the coast line in the Chukchi and Beaufort Seas.
30:2.0.1.2.7.5SUBPART E
Subpart E - Oil-Spill Response Requirements for Facilities Located on the Arctic OCS
30:2.0.1.2.7.5.127.1SECTION 254.65
     254.65 Purpose.
30:2.0.1.2.7.5.127.2SECTION 254.66-254.69
     254.66-254.69 [Reserved]
30:2.0.1.2.7.5.127.3SECTION 254.70
     254.70 What are the additional requirements for facilities conducting exploratory drilling from a MODU on the Arctic OCS
30:2.0.1.2.7.5.127.4SECTION 254.71-254.79
     254.71-254.79 [Reserved]
30:2.0.1.2.7.5.127.5SECTION 254.80
     254.80 What additional information must I include in the “Emergency response action plan” section for facilities conducting exploratory drilling from a MODU on the Arctic OCS
30:2.0.1.2.7.5.127.6SECTION 254.81-254.89
     254.81-254.89 [Reserved]
30:2.0.1.2.7.5.127.7SECTION 254.90
     254.90 What are the additional requirements for exercises of your response personnel and equipment for facilities conducting exploratory drilling from a MODU on the Arctic OCS
30:2.0.1.2.8PART 256
PART 256 - LEASING OF SULPHUR OR OIL AND GAS IN THE OUTER CONTINENTAL SHELF
30:2.0.1.2.8.1SUBPART A
Subpart A - Outer Continental Shelf Oil, Gas, and Sulphur Management, General
30:2.0.1.2.8.1.127.1SECTION 256.1
     256.1 Purpose.
30:2.0.1.2.8.1.127.2SECTION 256.7
     256.7 Cross references.
30:2.0.1.2.8.2SUBPART B
Subpart B - Assignments, Transfers, and Extensions
30:2.0.1.2.8.2.127.1SECTION 256.70
     256.70 Extension of lease by drilling or well reworking operations.
30:2.0.1.2.8.2.127.2SECTION 256.71
     256.71 Directional drilling.
30:2.0.1.2.8.2.127.3SECTION 256.72
     256.72 Compensatory payments as production.
30:2.0.1.2.8.2.127.4SECTION 256.73
     256.73 Effect of suspensions on lease term.
30:2.0.1.2.8.3SUBPART C
Subpart C - Termination of Leases
30:2.0.1.2.8.3.127.1SECTION 256.77
     256.77 Cancellation of leases.
30:2.0.1.2.8.4SUBPART D
Subpart D - Section 6 Leases
30:2.0.1.2.8.4.127.1SECTION 256.79
     256.79 Effect of regulations on lease.
30:2.0.1.2.9PART 259-260
PARTS 259-260 [RESERVED]
30:2.0.1.2.10PART 270
PART 270 - NONDISCRIMINATION IN THE OUTER CONTINENTAL SHELF
30:2.0.1.2.10.0.127.1SECTION 270.1
     270.1 Purpose.
30:2.0.1.2.10.0.127.2SECTION 270.2
     270.2 Application of this part.
30:2.0.1.2.10.0.127.3SECTION 270.3
     270.3 Definitions.
30:2.0.1.2.10.0.127.4SECTION 270.4
     270.4 Discrimination prohibited.
30:2.0.1.2.10.0.127.5SECTION 270.5
     270.5 Complaint.
30:2.0.1.2.10.0.127.6SECTION 270.6
     270.6 Process.
30:2.0.1.2.10.0.127.7SECTION 270.7
     270.7 Remedies.
30:2.0.1.2.11PART 280
PART 280 - PROSPECTING FOR MINERALS OTHER THAN OIL, GAS, AND SULPHUR ON THE OUTER CONTINENTAL SHELF
30:2.0.1.2.11.1SUBPART A
Subparts A-B [Reserved]
30:2.0.1.2.11.2SUBPART C
Subpart C - Obligations Under This Part
30:2.0.1.2.11.2.128SUBJGRP 128
  Interrupted Activities
30:2.0.1.2.11.2.128.1SECTION 280.20-280.24
     280.20-280.24 [Reserved]
30:2.0.1.2.11.2.128.2SECTION 280.25
     280.25 When may BSEE require me to stop activities under this part
30:2.0.1.2.11.2.128.3SECTION 280.26
     280.26 When may I resume activities
30:2.0.1.2.11.2.128.4SECTION 280.27
     280.27 When may BSEE cancel my permit
30:2.0.1.2.11.2.128.5SECTION 280.28
     280.28 May I relinquish my permit
30:2.0.1.2.11.3SUBPART D
Subparts D-E [Reserved]
30:2.0.1.2.12PART 281
PART 281 [RESERVED]
30:2.0.1.2.13PART 282
PART 282 - OPERATIONS IN THE OUTER CONTINENTAL SHELF FOR MINERALS OTHER THAN OIL, GAS, AND SULPHUR
30:2.0.1.2.13.1SUBPART A
Subpart A - General
30:2.0.1.2.13.1.129.1SECTION 282.0
     282.0 Authority for information collection.
30:2.0.1.2.13.1.129.2SECTION 282.1
     282.1 Purpose and authority.
30:2.0.1.2.13.1.129.3SECTION 282.2
     282.2 Scope.
30:2.0.1.2.13.1.129.4SECTION 282.3
     282.3 Definitions.
30:2.0.1.2.13.1.129.5SECTION 282.4
     282.4 [Reserved]
30:2.0.1.2.13.1.129.6SECTION 282.5
     282.5 Disclosure of data and information to the public.
30:2.0.1.2.13.1.129.7SECTION 282.6
     282.6 Disclosure of data and information to an adjacent State.
30:2.0.1.2.13.1.129.8SECTION 282.7
     282.7 Jurisdictional controversies.
30:2.0.1.2.13.2SUBPART B
Subpart B - Jurisdiction and Responsibilities of Director
30:2.0.1.2.13.2.129.1SECTION 282.10
     282.10 Jurisdiction and responsibilities of Director.
30:2.0.1.2.13.2.129.2SECTION 282.11
     282.11 Director's authority.
30:2.0.1.2.13.2.129.3SECTION 282.12
     282.12 Director's responsibilities.
30:2.0.1.2.13.2.129.4SECTION 282.13
     282.13 Suspension of production or other operations.
30:2.0.1.2.13.2.129.5SECTION 282.14
     282.14 Noncompliance, remedies, and penalties.
30:2.0.1.2.13.2.129.6SECTION 282.15
     282.15 [Reserved]
30:2.0.1.2.13.3SUBPART C
Subpart C - Obligations and Responsibilities of Lessees
30:2.0.1.2.13.3.129.1SECTION 282.20
     282.20 [Reserved]
30:2.0.1.2.13.3.129.2SECTION 282.21
     282.21 Plans, general.
30:2.0.1.2.13.3.129.3SECTION 282.22-282.26
     282.22-282.26 [Reserved]
30:2.0.1.2.13.3.129.4SECTION 282.27
     282.27 Conduct of operations.
30:2.0.1.2.13.3.129.5SECTION 282.28
     282.28 Environmental protection measures.
30:2.0.1.2.13.3.129.6SECTION 282.29-282.30
     282.29-282.30 [Reserved]
30:2.0.1.2.13.3.129.7SECTION 282.31
     282.31 Suspension of production or other operations.
30:2.0.1.2.13.4SUBPART D
Subpart D - Payments
30:2.0.1.2.13.4.129.1SECTION 282.40
     282.40 [Reserved]
30:2.0.1.2.13.4.129.2SECTION 282.41
     282.41 Method of royalty calculation.
30:2.0.1.2.13.4.129.3SECTION 282.42
     282.42 [Reserved]
30:2.0.1.2.13.5SUBPART E
Subpart E - Appeals
30:2.0.1.2.13.5.129.1SECTION 282.50
     282.50 Appeals.
30:2.0.1.2.14PART 285