Title 36

SECTION 292.69

292.69 Concurrent reclamation.

§ 292.69 Concurrent reclamation.

Plans of operations involving locatable minerals, operating plans involving outstanding mineral rights, and contracts or permits for mineral materials should all provide, to the maximum extent practicable, that reclamation proceed concurrently with the mineral operation.